Home   Locations   Contact Us
 

News and Information

Services Offered

Careers

 

 News and Information

 Request a Brochure

To request a brochure, please contact Beth Music at bmusic@wwcengineering.com

Updated Proposed Broadwater County Subdivision Regulations

Proposed Fire Standard Changes - January 25, 2008

Proposed Broadwater Subdivision Regulations Update - January 23, 2008

Updated Broadwater County Subdivision Regulations

Broadwater County Subdivision Regulations - Adopted October 31, 2006

Broadwater County Road Standards - Adopted October 31, 2006

Broadwater County Floodplain Ordinance - Adopted November 6, 2006

Laramie Water Supply Improvements

WWC’s Laramie office has been involved with projects for Pioneer Canal and Lake Hattie in Albany County since 1980. The most recent is the design of an enclosed pipeline from Sodergreen Lake and the Laramie River to bypass Pioneer Canal. Historically, Laramie’s water supply has been transported to the water treatment plant through Pioneer Canal, an open canal system. This canal loses around 50% of its water supply due to infiltration and evaporation. This increases to almost 100% during hot weather. By building an enclosed pipeline, the water supply for the town of Laramie will be effectively doubled. The finished pipeline will be a 36-inch line, running 3.3 miles, and paralleling Pioneer Canal. Total cost for this project is estimated to be approximately $15.37 million. WWDC funding has been applied for to fund a portion of the project.

To read the full article from the Laramie Boomerang
http://www.laramieboomerang.com/articles/2008/09/20/news/doc48d480f33e287615805260.tx
t

Casper Receives New Branch Manager

Darrin Tromble, formerly of the Sheridan office, has taken over the branch manager position in the Casper office.  Darrin replaces Barney Horrell (acting branch manager).

 State Framework Plan

A team headed by WWC Engineering has been selected by Wyoming Water Development Commission to prepare the State Framework Water Plan.

(For information concerning the WWDC and the State water planning process go to http://wwdc.state.wy.us/) 

 

 New Office Expansion

WWC Engineering has completed an expansion of office space in the Sheridan branch. Located at 1849 Terra Avenue in Sheridan, the 6500-square foot addition provides 24 offices as well as conference rooms and space for the growing CADD department.